Hwange Power Station Plant Improvement and Life Extension

Location   : existing 920 MW installed capacity Hwange Power  Station in western Zimbabwe
Generation Classification : Coal fired
Project Description  : Brownfield
Additional Capacity  : Revival of existing capacity to reliable operation
Estimated Construction Period : 3 months per unit
Transmission works  : Not significant
Estimated Project Cost  : To be advised
National Project Status  :  Not yet Applied For

Status: Scoping studies were done. Developing specifications.