POWER COLUMN Q2 2022

12 August 2022 In the period under review, ZPC sent out 2300.31GWh thereby marginally surpassing the quarterly target which was set at 2292.31GWh by 0.35%. Kariba Power Station contributed 72% of the total energy production in the period under review, Hwange Power Station contributed 27% while the ...